Monday 27 May 2013

Borang soal selidik Cadangan Membina Sebuah Jambatan Arch dan Lain-lain Kerja di Jalan Sungai Dua, Daerah Timur Laut, Pulau Pinang oleh Jabatan Pengairan dan Saliran

Sertai soal selidik di sini.




Masalah cerun bukit di Bukit Gambier

Hill slope problem in Bukit Gambier


    








Laporan Kaji Selidik di Terminal Bas Antara Negeri, Sungai Nibong (Tapak Pesta)




Laporan Kaji Selidik di Terminal Bas Antara Negeri, Sungai Nibong (Tapak Pesta)


Kaji selidik telah dijalankan di Perhentian Teksi Sungai Nibong di mana perbincangan telah diadakan dengan Gabungan Pemandu Teksi. Mereka telah mengadu beberapa kelemahan:
  1. Pintu utama ditutup menyebabkan kesukaran untuk penumpang, pengguna jalanraya dan kenderaan awam termasuk teksi. Hasilnya, banyak bas ekspres mengelak dari datang ke premis itu.
  2. Terdapat kehadiran besar teksi tidak berdaftar yang memberi kesan kepada pemandu teksi berdaftar.
  3. Tempat mengambil penumpang bagi pengguna bas ekspres berada di dalam zon perhentian teksi menyukarkan penumpang yang membawa bagasi berat dan juga penumpang kurang upaya (OKU).
  4. Tandas wanita telah dijaga oleh pekerja asing lelaki. Kedua-dua tandas didapati amat kotor.
  5. Restoran telah ditutup untuk sekian lama dan gerai-gerai penjaja yang tidak diselia dengan baik.
  6. Terdapat dua lif tetapi hanya satu yang berfungsi.
  7. Terdapat kekurangan zon khas menunggu bagi pengguna bas ekspres.

Walkthrough survey of Sungai Nibong Interstate Bus Terminal (Pesta Site)


The walkthrough was commenced at Sungai Nibong Taxi Stand. A discussion was held with Gabungan Pemandu Teksi. They complained a number of shortcomings:
  1. The main gate is kept closed causing great difficulties for commuters, passengers and pickup vehicles including taxis. As a result, many of the express buses avoid coming into the premises.
  2. There is a huge presence of private or unregistered taxis that affect the livelihood of those registered taxi drivers.
  3. The pickup area for passengers which is within the parking zone by the taxi stand making it difficult for the passengers with heavy luggage and the physically challenged (OKU).
  4. The ladies toilet was looked after by a male foreign worker. Both the toilets were filthy
  5. Restaurants has been closed for quite some time and hawker stalls are not properly run.
  6. There are two lifts but only one is functioning.
  7. There is a lack of proper waiting areas for the passengers.



Monday 20 May 2013

Sinkholes following shoddy work


At  about 3.05pm on Sunday 19th May 2013,  while passing through Jalan Permai just opposite Lintang Permai 1, I noticed that there were 2 large sink holes on the left hand side of the road.  They were each measuring 4 metres by 2metres and about 2 metres deep.  These 2 sink holes were being filled up with sand by an excavator and a manual compactor was being used.  The surface was soft with the possibilities of fresh sink holes appearing.

This is unacceptable as it posses a great danger to motorcyclist especially at night.  It is surprising that such shoddy work is being carried out apparently after the laying of drainage pipes.  We are also shocked that there is no check on such dangerous roadworks being done along Jalan Permai.  Many of the residents we spoke to voiced out their apprehension and fears.

We urge the authorities to check and take immediate action before accidents take place.